Electrical System Planning for the Land Office Building, North Bolaang Mongondow Regency
Abstract
Office buildings and homes are in dire need of electrical installations, but there are still quite a lot of people we meet who do not understand the design of safe electrical installations in accordance with the General Regulation on Electrical Installation (PUIL). By paying attention to PUIL in the installation of electrical installation design, a good and correct and safe electrical installation can be obtained. The purpose of this study is to determine a good and correct and safe electrical installation, determine the specifications and safety components needed and determine the recapitulation of the power used. The method of planning the electrical system in the building follows the standards that have been determined, namely PUIL 2020 and SNI energy conservation in lighting systems 2020. This planning produces installation design drawings in the form of situation drawings and one-line diagrams. From the calculation, a current of 55.63 Amperes was obtained and a total installed power of 36,571 VA, so that the main MCCB protection component was selected with a capacity of 3 x 63 Ampers. For the submission of electrical power connection services to PT. PLN (Persero) is 41,500 VA with a 3 x 25 Ampere MCB limiter. The type and cross-sectional area of the cable selected for the main cable based on PUIL 2020 is NYY 4 x 25 mm2.
References
[2] G. A. Setia, F. M. Nur, and F. Haz, “Studi Rekonfigurasi Jaringan Distribusi 20 kV pada Penyulang DPRD ULP Cianjur Kota Menggunakan ETAP,” Epsil. J. Electr. Eng. Inf. Technol., vol. 21, no. 1, pp. 38–48, 2023, doi: 10.55893/epsilon.v21i1.101.
[3] A. Lukmantara, “Sistem Mekanikal Dan Elektrikal (Sistem Utilitas) Gedung,” 2014. http://aloekmantara.blogspot.com/2014/10/sistem-mekanikal-dan-elektrikal-sistem.html.
[4] S. Humena, F. E. P. Surusa, Y. Malago, and T. Libunelo, “Analisis Pengaruh Peningkatan Beban Terhadap Sistem Ketenagalistrikan 150 kV Gorontalo Berbasis Power System Analysis Toolbox-Matrix Laboratory,” vol. 19, no. 01, pp. 10–17, 2020.
[5] S. A. Muis, “Instalasi Listrik Pada Gedung Bertingkat Program Studi Teknik Elektro Fakultas Teknologi Industri-ISTN rating arus pengaman 4 . Kebutuhan kapasitas trafo dan genset,” Sinusoida, vol. XXIII, no. 1, pp. 40–49, 2021.
[6] S. N. Indonesia, “Persyaratan Umum Instalasi Listrik 2020 (PUIL 2020),” DirJen Ketenagalistrikan, vol. 2020, pp. 1–133, 2020.
[7] I. Santoso, M. Dhofir, and H. Suyono, “Perancangan Instalasi Listrik Pada Blok Pasar Modern Dan Apartemen Di Gedung Kawasan Pasar Terpadu Blimbing Malang,” J. Jur. Tek. ELEKTRO, vol. 1, no. 11150331000034, pp. 1–147, 2018.
[8] Redaksi, “Terjadi Kebakaran di Kantor Bupati Bolmut,” satubmr.com, Boroko, 2018.
[9] P. I. Listrik and L. M. Siregar, “Oleh : Kelompok 4 Sintya Verina Br Tarigan Widya Hanun Zuhairi,” 2021.
[10] A. I. Pratiwi, S. Humena, and Hendrawan, “Analisa Kebutuhan Sistem Proteksi Petir Pada Gedung Pascasarjana Universitas Ichsan Gorontalo,” vol. 11, no. 2, 2023.
[11] J. Pattinasarany, J. Ticoh, R. Ridwan, and B. Kilis, “Perancangan Instalasi Tenaga Listrik di Bengkel Universitas Negeri Manado,” J. EDUNITRO J. Pendidik. Tek. Elektro, vol. 2, no. 1, pp. 19–28, 2022, doi: 10.53682/edunitro.v2i1.3343.
[12] R. Gobel et al., “Perancangan Sistem Elektrikal Gedung Asrama Terpadu Man 1 Kota Gorontalo,” Electrichsan, vol. 11, no. November, pp. 2252–8237, 2022.
[13] Badan Standardisasi Nasional, “Konservasi Energi pada Sistem Pencahayaan,” Standar Nas. Indones., pp. 1–38, 2020.
[14] M. S. P. Lesmana, “Desain Instalasi Listrik Bangunan Bertingkat Dan Rating Arus Pengaman - Studi Kasus Bangunan Pesantren Stp Smp / Sma Khoiru Ummah Sumedang Program Diploma Iii Teknologi Listrik Institut Teknologi Pln Jakarta , 2020 Lembar Pengesahan Desain Instalasi Listr,” 2020.
[15] M. Hariansyah, “Penerangan Dan Tenaga Di Gedung Workshop Pt . Basuh Power Electric,” pp. 28–36, 2014.