In the distribution system, blackouts caused by excessive loads cause losses for both consumers and electricity providers. Based on this, it is necessary to analyze the addition of distribution substations using an accurate methodology so that when applied it can be a solution to the need for electrical energi. Several stages of the method are determining the specifications of each component, calculating the optimal capacity of each component, measuring the voltage value contained in the panel and the primary part of the transformer at the hook-up substation, and simulating using ETAP software. The cantol substation was chosen because field studies have been carried out according to load requirements. The results of the calculation analysis show that with the addition of insertion substations, the total power becomes 100 kVA. The measured load at night is 77.7 kVA and during the day is 67.5 kVA. This indicates that the loading is in the allowable standard range below 80%. The voltage increased to 0.9828 per unit from the previous condition where there was a voltage drop of 11%. So that the load needs are met on demand.
References
[2] G. A. Setia, G. H. M. Sianipar, and R. T. Paribo, “The performance comparison between fast decoupled and backward-forward sweep in solving distribution systems,” 3rd IEEE Conf. Power Eng. Renew. Energy, ICPERE 2016, pp. 247–251, 2016, doi: 10.1109/ICPERE.2016.7904871.
[3] G. A. Setia, F. Haz, and G. H. M. Sianipar, “Performa Metode Aliran Daya Fast Decoupled di Jaringan Distribusi,” vol. 3, no. 2, pp. 249–254, 2018, doi: 10.31544/jtera.v3.i2.2018.249-254.
[4] I. M. A. Nugraha and I. G. M. N. Desnanjaya, “Penempatan Dan Pemilihan Kapasitas Transformator Distribusi Secara Optimal Pada Penyulang Perumnas,” J. Resist. (Rekayasa Sist. Komputer), vol. 4, no. 1, pp. 33–44, 2021, doi: 10.31598/jurnalresistor.v4i1.722.
[5] K. Wahyudi Widiatmika, I. W. Arta Wijaya, and I. N. Setiawan, “Analisis Penambahan Transformator Sisipan Untuk Mengatasi Overload Padatransformator Db0244 Di Penyulang Sebelanga,” J. SPEKTRUM, vol. 5, no. 2, p. 19, 2018, doi: 10.24843/spektrum.2018.v05.i02.p03.
[6] H. Prasetijo, “Rekonfigurasi Jaringan 20 kV untuk Perbaikan Profil Tegangan dan Susut Daya Listrik,” Techno, vol. 11, no. 2, pp. 56–63, 2010.
[7] A. S. Abrar Tanjung, Ontosenno Penangsang, “Rekonfigurasi sistem distribusi untuk mengatasi beban lebih dan meminimalkan rugi-rugi pada jaring distribusi menggunakan metode heuristik algoritma,” Semin. Nas. Apl. Teknol. Inf., vol. ISSN 1907-, no. Snati, pp. 23–25, 2007.
[8] G. H. M. Sianipar, G. Angga Setia, and M. F. Santosa, “Implementation of Axis Rotation Fast Decoupled Load Flow on Distribution Systems,” 3rd IEEE Conf. Power Eng. Renew. Energy, 2016.